Thanks Hood,
I just ordered a PMDX 126, a 107 spindle to VFD controller, and (3) Gecko 320x drives.
The Dugong saga continues. My full refund is on the way.
I really need supplies that can be sent to me quickly. This machine will be a money making machine, not a hobby.
There will be a spare drive, encoder, etc, on the shelf in case it quits in the middle of a job.
That is the reason behind the parts chosen above.
Availability from 2 weeks out to 3 months is something that makes me uneasy.
Some suppliers have assured me that they had a product in stock, and would ship it out the same day.
A week later, no parts.
I paid for the other stuff way back in March, still no parts.
JAckal