Thanks for the reply Ray, the problem I have encountered is when I tried to simulate the file it Stopped me saying there was a "Software Limits" issue. I am not sure where the problem is and this was the first thing that came to mind. I thought I would try to move the job into one quadrant because, If 0,0,0 is where the machine thinks home is, it also knows it is where the soft limit is right?
The file takes up a good bit of the work envelope on the X axis, so if there is say an 1.5" of the job in -X and the balance(5.5)" in +X axis which has an 8"travel, does that mean I should move my 0-X away from the home position an 1.5"? Does this even matter if I just want to simulate it? Colin