I'm using the lockdown version of Mach3, and the v015me SS plug-in. When I do a (manual) tool change, I often have to jog to position the tool over the work so I can set the Z position. Occasionally, after doing this, Mach and the SS seem to be out of sync, as the DROs will show the correct position, but if I start the program, the machine moves to the wrong position. For example, suppose it is at X=0 when the tool change occurs, and I jog to X=2, set the Z height, then hit Run. If the next move is to X=4, it will instead move to X=6, though the DRO will indicate X=4. Oddly, if I then do a G0 X0, it does correctly go to Z=0 and it's fine after that. I have experienced this problem intermittently for months.
Is this fixed in the current SS plugin?
Regards,
Ray L.